Pre-drywall: Before walls and ceilings close up
Ask when framing and the rough-in work included in your inspection will be ready, and when insulation and drywall are scheduled. Share those dates with our office before the builder covers the work. Depending on readiness and scope, the report may document visible framing, plumbing, wiring, or ductwork.
Final: When the home is ready, before closing
Ask when utilities, fixtures, appliances, and equipment will be ready. Leave time before closing to read the report, share questions with your builder, and discuss follow-up. If work is unfinished or utilities are off, tell our office before the appointment.
11-month: Work backward from your warranty deadline
Check your warranty documents for the actual end date and how to give notice. Schedule early enough to review your report and send concerns to the builder by the required deadline. The inspection documents observed conditions; your warranty terms govern coverage.
Builder coordination checklist
Ask the builder or site superintendent to confirm these details before you book.
- When the site will be ready and when work will be covered.
- Who can approve the visit, provide access, and explain any site safety requirements.
- Which systems will be ready and which may still be unfinished.
- Your closing date or warranty notice deadline, and who should receive the report.
- Who will notify the inspection office if the schedule changes.